Work Jobs needed to be done.

For further info email Mike

When a Project has been completed please email Neil and inform us of it. Thank you.



Home
About Us


 

Job Notes Completed


 
 
 
 

Job; Notes; Completed
DINING HALL:    
Design and build barrier in storage area so our groceries are not available to camp renters.    
Replace Heavy Screens on back doors.    
Build shelves across the Freezer Chests end of Porch to store Vacuum Cleaners.    
Plastic water supply lines need to be run to the swamp coolers.    
Water faucets leak and need to be replaced on Kitchen sinks    
Bolt down outside drinking fountain    
Service and check the Dishwasher    


 

Job; Notes; Completed;
NURSES CABIN:    
Replace carpet in assembly room & Bathroom with Vinyl linoleum    
Put molding around the corners of the 4 doors.    
Build deck on the front of the cabin and ask hunters to remove muddy boots there.    
Rent a carpet cleaner to clean the carpets. They are VERY dirty from tracked in mud. Need to be replaced not cleaned  
Repair screen door    
Rebuild the handrail on entrance door.    
Hang pegboard above stove with hooks to store pots and pans.    
Build some shelves to store blankets, towels, sleeping bags.    
Wash all bedding    


 
 

Job; Notes; Completed;
JAMES CABIN (Storage Cabin close to Nurse's Cabin)    


 

 

Job; Notes; Completed;
14 HOLER    
Fabricate hooks to hold the seat lids up    
Paint inside of building    
Repair (replace) door on East Side    


 

Job; Notes; Completed;
GIRLS CABINS:    
All 7 cabins need screen protector installed on inside of screen door. 22 x 30 metal screens are about $25.00    
All cabins need screen replaced in doors. There is some on hand. Maybe enough.    
Many of cabins need repair to screen doors with new molding installed.    
Some cabins need inside door cut off so it will open all the way.    
Clothes line on back of cabins need repair.    
Rachel, Rebekah do not have Screen Doors. There may be storm doors in the double door storage shed that would fit.    
One of the cabins has a broken 11 x 15 glass. There is glass on hand that could be used.    


 

Job; Notes; Completed;
FENCE IN THE PARKING AREA:    


 

Job; Notes; Completed;
TOOL SHED BEHIND THE GIRLS CABINS:    
Vacuum Out the foliage some "animal" has carried into the cabin and placed in open nail cans    
Remove pipes from beside the cabin and determine if there is enough pipe to build Soccer goals.    
Cut foliage from around cabin and cover holes that animals use for entrance.    
Organize cans of bolts, screws, nails, etc.    


 

Job; Notes; Completed;
MULTIPURPOSE BUILDING    
Vent turbine is off one of the top vents.    
If building is to be use for worship, build a platform, cover it with carpet    
Where can we borrow some scaffolding to work in the Multipurpose Building and also  use in shower rooms to paint the ceilings?    
When new platform is built, Electrical outlets for sound, projectors, lights need to be installed    


 

Job; Notes; Completed;
CHAPEL    
If Services are held in the Multipurpose bldg., could folding doors be installed in the present Chapel to make two classrooms? Divider could be built above them.    
Electrical Cord supplying light to the campfire area is on the ground. Better wiring would be preferred. Mark M. is handling this.  


 
 

Job; Notes; Completed;
BOYS AND GIRLS SHOWER HOUSES    

Replace the women's and men's shower stall walls

At the camp meeting, glass board was discussed as the correct type to replace the walls with.

 
Several leaks in plumbing    
Handrail on Boys needs to be rebuilt with posts set at bottom of handrail.    
Water system is "mickey mouse" with valves. System needs to be "cleaned up" with a small shed built to house the system.    
Showers need caulking    
Showers would be ‘nicer' if epoxy paint was applied to the floor area of the shower.    
Lights in the Girls side need fluorescent tubes replaced. The are 8 ft. long and need to be ordered. (Do they have 2 pins or 1 point?) Mark M. is handling this.  


 
 

Job; Notes; Completed;
WATCH LADIES CABIN    
Design and build a screen door so the basement is ventilated and not damp year around.    


 

Job; Notes; Completed;
GENERAL MAINTENANCE    
Paint the trim on the windows around camp 3  
Reset nails on the metal roofing.    
Haul mowers to a small engine repair and have engine tuned, blades sharpened and mower checked over.    
Is there enough pipe around the camp to build 2 soccer goals? We have wrenches and a pipe threader.    
Get 6 more padlocks that will work on the keys we have. Get 6 hasps for the locks.    
Get larger eye screws for door springs. Perhaps eye-bolts would last longer?    
Check vacuum cleaners. Replace the vacuum's with small Shop Vac's.    
"Junk" under the Dining Hall & Boys Dorm should be pulled out and stored elsewhere. It is an "invitation" for mice, rats, snakes to live in.    
Purchase tarps to hang on the sides of the Pavilion    
Build a fireplace on the side of the Pavilion so it could be used for campfire during rainy weather.    


 
 

  3.. Paint the trim on the windows around camp.  Just about all the window trims are in bad shape.  Anyone who likes to paint could help with this.  I inventoried the paint and believe we have enough white paint to do all of the trim.