Little Rockies Christian Camp
For further info email Mike
When a Project has been completed please email Neil and inform us of it. Thank you.

| Job | Notes | Completed |
| Job; | Notes; | Completed |
| DINING HALL: | ||
| Design and build barrier in storage area so our groceries are not available to camp renters. | ||
| Replace Heavy Screens on back doors. | ||
| Build shelves across the Freezer Chests end of Porch to store Vacuum Cleaners. | ||
| Plastic water supply lines need to be run to the swamp coolers. | ||
| Water faucets leak and need to be replaced on Kitchen sinks | ||
| Bolt down outside drinking fountain | ||
| Service and check the Dishwasher |
| Job; | Notes; | Completed; |
| NURSES CABIN: | ||
| Replace carpet in assembly room & Bathroom with Vinyl linoleum | ||
| Put molding around the corners of the 4 doors. | ||
| Build deck on the front of the cabin and ask hunters to remove muddy boots there. | ||
| Rent a carpet cleaner to clean the carpets. They are VERY dirty from tracked in mud. | Need to be replaced not cleaned | |
| Repair screen door | ||
| Rebuild the handrail on entrance door. | ||
| Hang pegboard above stove with hooks to store pots and pans. | ||
| Build some shelves to store blankets, towels, sleeping bags. | ||
| Wash all bedding |
| Job; | Notes; | Completed; |
| JAMES CABIN (Storage Cabin close to Nurse's Cabin) |
| Job; | Notes; | Completed; |
| 14 HOLER | ||
| Fabricate hooks to hold the seat lids up | ||
| Paint inside of building | ||
| Repair (replace) door on East Side |
| Job; | Notes; | Completed; |
| GIRLS CABINS: | ||
| All 7 cabins need screen protector installed on inside of screen door. 22 x 30 metal screens are about $25.00 | ||
| All cabins need screen replaced in doors. There is some on hand. Maybe enough. | ||
| Many of cabins need repair to screen doors with new molding installed. | ||
| Some cabins need inside door cut off so it will open all the way. | ||
| Clothes line on back of cabins need repair. | ||
| Rachel, Rebekah do not have Screen Doors. There may be storm doors in the double door storage shed that would fit. | ||
| One of the cabins has a broken 11 x 15 glass. There is glass on hand that could be used. |
| Job; | Notes; | Completed; |
| FENCE IN THE PARKING AREA: |
| Job; | Notes; | Completed; |
| TOOL SHED BEHIND THE GIRLS CABINS: | ||
| Vacuum Out the foliage some "animal" has carried into the cabin and placed in open nail cans | ||
| Remove pipes from beside the cabin and determine if there is enough pipe to build Soccer goals. | ||
| Cut foliage from around cabin and cover holes that animals use for entrance. | ||
| Organize cans of bolts, screws, nails, etc. |
| Job; | Notes; | Completed; |
| MULTIPURPOSE BUILDING | ||
| Vent turbine is off one of the top vents. | ||
| If building is to be use for worship, build a platform, cover it with carpet | ||
| Where can we borrow some scaffolding to work in the Multipurpose Building and also use in shower rooms to paint the ceilings? | ||
| When new platform is built, Electrical outlets for sound, projectors, lights need to be installed |
| Job; | Notes; | Completed; |
| CHAPEL | ||
| If Services are held in the Multipurpose bldg., could folding doors be installed in the present Chapel to make two classrooms? Divider could be built above them. | ||
| Electrical Cord supplying light to the campfire area is on the ground. Better wiring would be preferred. | Mark M. is handling this. |
| Job; | Notes; | Completed; |
| BOYS AND GIRLS SHOWER HOUSES | ||
|
Replace the women's and men's shower stall walls |
At the camp meeting, glass board was discussed as the correct type to replace the walls with. |
|
| Several leaks in plumbing | ||
| Handrail on Boys needs to be rebuilt with posts set at bottom of handrail. | ||
| Water system is "mickey mouse" with valves. System needs to be "cleaned up" with a small shed built to house the system. | ||
| Showers need caulking | ||
| Showers would be nicer' if epoxy paint was applied to the floor area of the shower. | ||
| Lights in the Girls side need fluorescent tubes replaced. The are 8 ft. long and need to be ordered. (Do they have 2 pins or 1 point?) | Mark M. is handling this. |
| Job; | Notes; | Completed; |
| WATCH LADIES CABIN | ||
| Design and build a screen door so the basement is ventilated and not damp year around. |
| Job; | Notes; | Completed; |
| GENERAL MAINTENANCE | ||
| Paint the trim on the windows around camp | 3 | |
| Reset nails on the metal roofing. | ||
| Haul mowers to a small engine repair and have engine tuned, blades sharpened and mower checked over. | ||
| Is there enough pipe around the camp to build 2 soccer goals? We have wrenches and a pipe threader. | ||
| Get 6 more padlocks that will work on the keys we have. Get 6 hasps for the locks. | ||
| Get larger eye screws for door springs. Perhaps eye-bolts would last longer? | ||
| Check vacuum cleaners. Replace the vacuum's with small Shop Vac's. | ||
| "Junk" under the Dining Hall & Boys Dorm should be pulled out and stored elsewhere. It is an "invitation" for mice, rats, snakes to live in. | ||
| Purchase tarps to hang on the sides of the Pavilion | ||
| Build a fireplace on the side of the Pavilion so it could be used for campfire during rainy weather. |
3.. Paint the trim on the windows around camp. Just about all the window trims are in bad shape. Anyone who likes to paint could help with this. I inventoried the paint and believe we have enough white paint to do all of the trim.